Month: <span>August 2019</span>

Detailing

Today is all about the fine details to make the ship look realistic, by adding flags and all the small touches that most will not see but from my point it helps to complete the model. Union Flag


The Crane

The main crane has taken a few evenings work to design on CAD,and the final files made ready for 3D printing. The main jib took around 9 hours to print and the control section only took 3 hours, but I am always amazed with the results from the printer. As you will see the image…


Main Deck Fittings

I had a fair amount of work on the main deck to fit the anchors and relevant lockers and other vents, but the final result is fantastic. I added the main anchor chains and the locking chains which are in black, and all thats left to do in this area is to add the flag…


Stanchions

Today has been a day of working on getting the last of the stanchions in place, painted, and then the slow but rewarding process of adding the cord to all the stanchions. Some of the decks have two rows of cord and the two largest decks have three rows, so to help get the spacing…


Detailing Work

Once the rear mast was finished and fitted it was time to start the detailing work, and to drill and fit all the stanchions.I started by fitting all the lockers, vent pipes and mushroom vents before moving onto the finer details such as the guns.The final step was to start fitting all the cord to…


Rear Mast

The past weekend was spent working on the rear mast and fitting it out with the platforms and mast stays. I set this aside to dry while I made all the copper wire ladder rings, of which there were over 60 required and then it was only the drilling to do all 120 plus holes.I…


Onward and Upwards

The last few days have been all about the main structure and getting all the detailing done and correct.I have now started to add items such as the search lights, water tanks and vents, with a mass of brass etch items added such as ladders and steps. Below are a couple of photos showing the…