Once the rear mast was finished and fitted it was time to start the detailing work, and to drill and fit all the stanchions.
I started by fitting all the lockers, vent pipes and mushroom vents before moving onto the finer details such as the guns.
The final step was to start fitting all the cord to the stanchions, which is a time consuming job as each section is tied in lace and checked with a laser cut jig to ensure that the cords run parallel.
Build Updates
- September 2019 (1)
- August 2019 (7)
- July 2019 (8)
- June 2019 (6)
- May 2019 (20)
- April 2019 (5)
- March 2019 (4)