The past weekend was spent working on the rear mast and fitting it out with the platforms and mast stays. I set this aside to dry while I made all the copper wire ladder rings, of which there were over 60 required and then it was only the drilling to do all 120 plus holes.I…
Completed Parts
Today was a day of painting all the 3D printed parts, either by brush but mainly with the use of an airbrush.As you can see from the image below there is a growing number of parts all ready for being installed onto the model as each stage progresses. There are only two main parts to…
6″ Director Platform
We are now starting to near the end of the platforms required for the forward mast with this 6″ Director Platform, which only leaves the Torpedo Lookout Platform to design and 3D print. This platform is quite simple in design compared to some others, but I reduced the size of the two mast supports as…
Build Updates
- September 2019 (1)
- August 2019 (7)
- July 2019 (8)
- June 2019 (6)
- May 2019 (20)
- April 2019 (5)
- March 2019 (4)